220kV Substation Partial Discharge and Temperature Monitoring Project Case

220kV Substation Partial Discharge and Temperature Monitoring Project Case

Project BackgroundWith the continuous increase in power grid load, there are growing demands for real-time monitoring of high-voltage equipment. To enhance intelligent operation and maintenance of electrical equipment and prevent partial discharge and overheating faults, a 220kV substation in Jiangxi has introduced Zhuhai Huwor Technology’s online partial discharge and temperature monitoring system. This system provides […]

220kV Substation Partial Discharge and Temperature Monitoring Project Case Read More »

Partial Discharge and Temperature Monitoring Project at a 110kV Substation

Partial Discharge and Temperature Monitoring Project at a 110kV Substation in Jiangxi, China

1. Project Background With increasing demands for safe operation and intelligent maintenance of power systems, traditional manual inspections can no longer meet the requirements for real-time, accurate, and efficient monitoring. To enhance equipment reliability, a 110kV substation in Jiangxi Province introduced an advanced online partial discharge (PD) and temperature monitoring system developed by HuaWang Technology.

Partial Discharge and Temperature Monitoring Project at a 110kV Substation in Jiangxi, China Read More »